Commercial and industrial energy storage
์ƒ์—…์šฉ ๋ฐ ์‚ฐ์—…์šฉ ์—๋„ˆ์ง€ ์Šคํ† ๋ฆฌ์ง€
Herewin Home Energy Storage Battery
ํ™ˆ ์—๋„ˆ์ง€ ์Šคํ† ๋ฆฌ์ง€
488642711_1278865830906565_7716202339252007488_n
๋“œ๋ก 
pexels-cookiecutter-1148820
ํ†ต์‹  ๋ฐฑ์—… ์ „์›
Low-Speed Electric Vehicles
์ €์† ์ „๊ธฐ ์ž๋™์ฐจ
Compact RV Travel
RV ํŒŒ์›Œ
forklift
์ง€๊ฒŒ์ฐจ
Lead To Lithium Conversion
๋ฆฌํŠฌ ์ „ํ™˜์œผ๋กœ ๋ฆฌ๋“œ

์ ์ธตํ˜• ๊ณ ์ „์•• ๋ฐฐํ„ฐ๋ฆฌ ํŒฉ

This modular high-voltage system enables scalable energy storage capacity. Utilizing advanced battery technology, it offers a long cycle life and high operational efficiency. Ideal for large residential homes and commercial spaces that require higher storage volumes.

์Šคํƒํ˜• ๊ณ ์ „์•• ๋ฐฐํ„ฐ๋ฆฌ ํŒฉ

์‹œ์Šคํ…œ ์ „์••: 409.6V

์ •๊ฒฉ ์šฉ๋Ÿ‰: 50Ah

๊ทธ๋ฆฌ๋“œ ์—ฐ๊ฒฐ: ์˜คํ”„ ๊ทธ๋ฆฌ๋“œ/ํ•˜์ด๋ธŒ๋ฆฌ๋“œ

์œ ํ˜•: ๋ถ„ํ• ํ˜•(๋ชจ๋“ˆํ˜•)

๋ฐฐํ„ฐ๋ฆฌ ์œ ํ˜•: LiFePOโ‚„(๋ฆฌํŠฌ ์ฒ  ์ธ์‚ฐ์—ผ)

๋ฌด๊ฒŒ: 280.5kg

์น˜์ˆ˜ 480 ร— 132 ร— 586 mm

์ œํ’ˆ ์นดํ…Œ๊ณ ๋ฆฌ
๋ฌด๋ฃŒ ๊ฒฌ์  ๋ฐ›๊ธฐ
๋ฌธ์˜ ์–‘์‹ ๋ฐ๋ชจ(#3)

์• ํ”Œ๋ฆฌ์ผ€์ด์…˜

Villa Basement Energy Storage
๋นŒ๋ผ ์ง€ํ•˜์‹ค ์—๋„ˆ์ง€ ์ €์žฅ

Modular stackable design makes it easy to expand capacity to meet large home power needs.

Home Swimming Pool Power
Home Swimming Pool Power

High-voltage battery packs reliably run pumps and temperature control systems for worry-free swimming.

Home EV Charger Support
Home EV Charger Support

Balances high-power charging loads to protect your homeโ€™s electrical network.

Small Guesthouse Power Supply
Small Guesthouse Power Supply

Flexible expandable storage solutions to handle commercial-level power fluctuations.

Home Greenhouse Temperature Control
Home Greenhouse Temperature Control

Provides steady, continuous power to maintain a stable environment for plant growth.

DIY Energy Lab
DIY Energy Lab

High-voltage modular design to meet the custom needs of energy enthusiasts.

๋ฌด๋ฃŒ ๋””์ž์ธ

๋งž์ถคํ˜• ์ „์šฉ ๋ฐฐํ„ฐ๋ฆฌ ํ”Œ๋žœ! ์ „๋ฌธ ์—”์ง€๋‹ˆ์–ด๊ฐ€ ์ผ๋Œ€์ผ๋กœ ๋ฐฐํ„ฐ๋ฆฌ ํ”„๋กœ๊ทธ๋žจ์„ ๊ณ„ํšํ•ฉ๋‹ˆ๋‹ค.

๋งž์ถคํ˜• ๋ฐฐํ„ฐ๋ฆฌ ์†”๋ฃจ์…˜์œผ๋กœ ๋“œ๋ก  ํšจ๊ณผ ๊ทน๋Œ€ํ™”

EES-Propose-Requests
์š”์ฒญ ์ œ์•ˆ
Customized-Solution
๋งž์ถคํ˜• ์†”๋ฃจ์…˜
End-to-End-Controlled-Production-Testing
์—”๋“œํˆฌ์—”๋“œ ์ œ์–ด ์ƒ์‚ฐ ๋ฐ ํ…Œ์ŠคํŠธ
Warehouse-and-shipped-out
์ฐฝ๊ณ  ์ž…๊ณ  ๋ฐ ๋ฐฐ์†ก

ํ—ค๋ ˆ์œˆ ํŒฉํ† ๋ฆฌ ์‚ดํŽด๋ณด๊ธฐ: ํ’ˆ์งˆ์˜ ์›์ฒœ

2019๋…„์— ์„ค๋ฆฝ๋œ ์‹ฌ์ฒœ ์ž์œˆ ํƒ€์ž„ ํ…Œํฌ๋†€๋กœ์ง€๋Š” ๋ฐฐํ„ฐ๋ฆฌ ์—…๊ณ„์—์„œ 20๋…„ ์ด์ƒ์˜ ํญ๋„“์€ ๊ฒฝํ—˜์„ ๊ฐ€์ง„ ์„ค๋ฆฝ ๋ฐ ์šด์˜ ํŒ€์˜ ์ง€์›์„ ๋ฐ›๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๊ณ ์„ฑ๋Šฅ ๋ฆฌํŠฌ ์ด์˜จ ํด๋ฆฌ๋จธ ๋ฐฐํ„ฐ๋ฆฌ์˜ ๊ฐœ๋ฐœ ๋ฐ ์ƒ์‚ฐ์„ ์ „๋ฌธ์œผ๋กœ ํ•ฉ๋‹ˆ๋‹ค.
Facebook์ด ๋ˆ„๊ตฌ์ด๋ฉฐ ๋ฌด์—‡์„ ์ง€ํ–ฅํ•˜๋Š”์ง€์— ๋Œ€ํ•œ ํฌ๊ด„์ ์ธ ์ธ์‚ฌ์ดํŠธ๋ฅผ ์–ป์œผ์„ธ์š”. ์„ธ์‹ฌํ•œ ์ •ํ™•์„ฑ์„ ์ž๋ž‘ํ•˜๋Š” ์ €ํฌ์˜
์ƒ์‚ฐ ๋ผ์ธ, ๊ณต์žฅ์˜ ํšจ์œจ์ ์ธ ๊ด€๋ฆฌ, ๋งŒ์กฑํ•œ ๊ณ ๊ฐ๋“ค์˜ ์ง„์ •ํ•œ ํ”ผ๋“œ๋ฐฑ์ด ์žˆ์—ˆ๊ธฐ์— ๊ฐ€๋Šฅํ–ˆ์Šต๋‹ˆ๋‹ค,
ํ”„๋กœ์„ธ์Šค์˜ ๋ชจ๋“  ๋‹จ๊ณ„์—์„œ ์šฐ์ˆ˜์„ฑ์„ ๋ณด์žฅํ•˜๋Š” ๋ฐฉ๋ฒ•์„ ํ™•์ธํ•  ์ˆ˜ ์žˆ์Šต๋‹ˆ๋‹ค.

๋‹ค์–‘ํ•œ ํŒจํ„ด์˜ ๊ณ ๊ฐ์„ ์œ„ํ•œ ๋‹ค์–‘ํ•œ ์„œ๋น„์Šค

์˜คํ”„๋ผ์ธ ๊ณ ๊ฐ์šฉ

์œ ์—ฐํ•œ ๋ฐฐ์†ก ์‹œ๊ฐ„

์•ˆ์ •์ ์ธ ๋ฐฐ์†ก ์ผ์ • ๋ฐ ์ฐฝ๊ณ  ์ง€์›.

๋†’์€ ๋น„์šฉ ํšจ์œจ์„ฑ

์ „์ฒด ๊ฐ€์น˜๋ฅผ ๊ทน๋Œ€ํ™”ํ•˜๋Š” ๊ฒฝ์Ÿ๋ ฅ ์žˆ๋Š” ๊ฐ€๊ฒฉ.

๋‹ค์–‘ํ•œ ์ œํ’ˆ ์„ ํƒ

๋ชจ๋“  ์‹œ์žฅ ๋ถ€๋ฌธ์„ ์ถฉ์กฑํ•˜๋Š” ๋‹ค์–‘ํ•œ ์˜ต์…˜.

์˜จ๋ผ์ธ ๊ณ ๊ฐ์šฉ

๋‚ฎ์€ MOQ

ํ˜ผํ•ฉ ์ œํ’ˆ ์˜ต์…˜์œผ๋กœ ์œ ์—ฐํ•œ MOQ.

์‚ฌ์šฉ์ž ์ง€์ • ๋กœ๊ณ 

์†Œ๊ทœ๋ชจ ๋ฐฐ์น˜๋ฅผ ์œ„ํ•œ ๋งž์ถคํ˜• ๋กœ๊ณ  ์‚ฌ์šฉ์ž ์ง€์ •.

์›์Šคํ†ฑ ๋งˆ์ผ€ํŒ… ํŒจํ‚ค์ง€

๊ณ ํ’ˆ์งˆ ์ด๋ฏธ์ง€, ๋™์˜์ƒ์„ ์ œ๊ณตํ•˜์—ฌ ํŒ๋งค ์ˆ˜์ต์„ ๋†’์ผ ์ˆ˜ ์žˆ์Šต๋‹ˆ๋‹ค.

๋ธŒ๋žœ๋“œ ๊ณ ๊ฐ์šฉ

์ง€์—ญ ๋…์  ๊ถŒํ•œ

ํ—ค๋ฆฌ์œˆ์˜ ๋ชจ๋“  ๋ฆฌ์†Œ์Šค ๋ฐ ๊ธฐ๋Šฅ ์ œ๊ณต

R&D Resources

Custom sample within 7 days with R&D capabilities.

๋น ๋ฅธ ๋ฐฐ์†ก

ํšจ์œจ์ ์ธ ์ƒ์‚ฐ์œผ๋กœ ์ตœ๋‹จ 25์ผ ์ด๋‚ด์— ๋ฐฐ์†กํ•ฉ๋‹ˆ๋‹ค.

Production Flow of Home Energy Batteryโ€‹

Step1๏ผšUnpack-Materials
Step1๏ผšUnpack Materials

Open packaging, sort components.

Step2๏ผšFull-Visual-Inspection_
Step2๏ผšFull Visual Inspection

Inspect grouped cells for defects: leakage, scratches, dents, punctures, swelling.

Step3๏ผšVoltageResistance-Screening_
Step3๏ผšVoltage/Resistance Screening

Test cell voltage and internal resistance; rebalance cells with excessive voltage deviations.

Step4๏ผšTab-Punching
Step4๏ผšTab Punching

Punch holes in cell tabs using a stamping machine.

Step5๏ผšAdapter-Board-Assembly
Step5๏ผšAdapter Board Assembly

Mount cells onto adapter boards per specs, secure tightly with fiber tape.

Step6๏ผšTab-Alignment
Step6๏ผšTab Alignment

Fold tabs in half with a rubber mallet and align holes with PCB board positions.

Step7๏ผšScrew-Fastening
Step7๏ผšScrew Fastening

Secure aluminum plates to adapter boards with screws; verify torque.

Step8๏ผšFiberboard-Installation
Step8๏ผšFiberboard Installation

Wrap battery module with fiberboard and seal edges with fiber tape.

Step9๏ผšCasing-Integration
Step9๏ผšCasing Integration

Tilt module into lower casing, secure series wiring by loosening screws incrementally, apply silicone adhesive, fix top fiberboard, then fully insert into casing.

Step10๏ผšWiring-Connection
Step10๏ผšWiring Connection

Plug sensing wire terminals into sockets and secure with adhesive.

Step11๏ผšPerformance-Testing
Step11๏ผšPerformance Testing

Use a voltage tester to measure the maximum and minimum cell voltage difference of the battery pack (โ‰ค15 mV), followed by open-circuit voltage, AC impedance, and charge/discharge (including overcurrent) tests.

Step12๏ผšAging-Cycle
Step12๏ผšAging Cycle

Stabilize performance through cycling and screen for defects pre-final assembly.

Step13๏ผšCover-Installation
Step13๏ผšCover Installation

Attach top cover to casing with screws.

Step14๏ผšComprehensive-Functional-Testing
Step14๏ผšComprehensive Functional Testing

ํ†ต์‹ , ์ถœ๋ ฅ ์ „์••, ์˜จ๋„ ๊ฐ์ง€, ๋ฐฉ์ „ ๊ณก์„  ๋ฐ ๋ˆ„์ถœ์„ ํ™•์ธํ•ฉ๋‹ˆ๋‹ค.

Step15๏ผšFinal-Visual-QA
Step15๏ผšFinal Visual QA

Inspect surface for flaws, check display buttons for smooth operation (no sticking).

Step16๏ผšPackaging
Step16๏ผšPackaging

Label units, place in foam-lined boxes, seal in PE bags with desiccant, add top foam padding.

Step17๏ผšShipping
Step17๏ผšShipping

๋ฐ•์Šค ์Šน์ธ ์œ ๋‹› ๋ฐ ๋ฐœ์†ก.

์ž์„ธํžˆ ์•Œ์•„๋ณด๊ธฐ

์ƒ์‚ฐ ์„ธ๋ถ€ ์ •๋ณด ๋ฐ ์ œ์กฐ ๊ณต์ •์— ๋Œ€ํ•ด ์ž์„ธํžˆ ์•Œ์•„๋ณด๊ธฐ

ํ…Œ์ŠคํŠธ ํ”„๋กœ์„ธ์Šค

๊ณต์ • ๋ฐ ์ธ์ฆ

์ธ์ฆ์€ ํ—ค๋ฆฌ์œˆ์˜ ๊ฐ€์žฅ ํฐ ๊ฐ•์ ์ž…๋‹ˆ๋‹ค.
๋ชจ๋“  ์‹œ์žฅ์˜ ์š”๊ตฌ ์‚ฌํ•ญ์„ ์ถฉ์กฑํ•˜๋ฉฐ, ์†Œ์Šค ๊ณต์žฅ์€ ํ’ˆ์งˆ์„ ๋ณด์žฅํ•˜๊ธฐ ์œ„ํ•ด ์™„์ „ํžˆ ์ธ์ฆ๋˜์—ˆ์Šต๋‹ˆ๋‹ค.

Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title

์—ฐ๋ฝํ•˜๊ธฐ

์‹œ์žฅ์— ํ•„์š”ํ•œ ์ž๊ฒฉ ์ฆ๋ช…์ด ๋ฌด์—‡์ธ์ง€ ์•Œ๊ณ  ์‹ถ์œผ์‹ ๊ฐ€์š”? ๊ณ ํ•ด์ƒ๋„ ์ด๋ฏธ์ง€๋ฅผ ๋ณด๋‚ด๋“œ๋ฆฌ๋ ค๋ฉด ์—ฐ๋ฝ์ฃผ์„ธ์š”.

๊ด€๋ จ ์นดํ…Œ๊ณ ๋ฆฌ

Drone-Battery-
Battery-Cells-1
Semi-Solid State Drone Battery
Industrial-EV-Battery-Packs
Commercial-Industrial-Energy-Storage-Solutions-4

์ž์ฃผ ๋ฌป๋Š” ์งˆ๋ฌธ

Will running multiple high-power devices (air conditioning, underfloor heating) at the same time cause overload in a villa backup power setup?

The fully-featured deluxe villa backup power model (48V 600Ah+) is built to support high-power output for large homes. To optimize usage, we recommend setting device prioritiesโ€”powering essentials like security systems and the fridge first, then air conditioning. Alternatively, choose the smart load management version, which automatically distributes power based on real-time demand.

๊ด€๋ จ ๋ธ”๋กœ๊ทธ

Why telecom sites are shifting from VRLA to LiFePO4 backupโ€”space, thermal limits, lifetime trade-offs, and how to choose a 48V system.
A practical decision guide for UAV OEMs: when soft pack (pouch) packs improve CG, packaging, and integration vs cylindrical architectures.
Agricultural spray drone battery workflow showing battery swap and refillโ€”why hectares per hour matters more than flight time.
Stop over-optimizing flight time. Use cycle-time metrics to evaluate agricultural drone batteries and increase hectares per hour.
Agricultural drone battery ROI โ€” ground time and field turnaround constraints
Flight time doesnโ€™t define ROI. Ground time limits cycles, hectares/day, and cost per hectareโ€”hereโ€™s the evaluation framework.
Best storage charge for UAV batteries shown as ~50% SOC and 3.8V per cell in controlled storage
Store UAV batteries at 30โ€“60% SOC (about 3.8V per cell) to reduce storage aging, preserve capacity, and extend service life.
Prototype UAV batteries vs production variance affecting pack performance
Why prototype UAV batteries pass tests but fail at production scaleโ€”and how to evaluate suppliers on variation control, EOL testing, and traceability.

์ƒˆ๋กœ์šด ์นดํƒˆ๋กœ๊ทธ

Learn more about Home Energy Storage solutions, and the full range of products

ko_KRํ•œ๊ตญ์–ด
๋งจ ์œ„๋กœ ์Šคํฌ๋กค

์ง€๊ธˆ ๋ฌด๋ฃŒ ๊ฒฌ์  ๋ฐ›๊ธฐ!

๋ฌธ์˜ ์–‘์‹ ๋ฐ๋ชจ(#3)
๊ถ๊ธˆํ•œ ์ ์ด ์žˆ์œผ์‹œ๋ฉด ์–ธ์ œ๋“ ์ง€ ๋ฌธ์˜ํ•ด ์ฃผ์„ธ์š”.