Commercial and industrial energy storage
ๅ•†ๆฅญใƒป็”ฃๆฅญ็”จใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต
1737451508966
ๅฎถๅบญ็”จใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต
pexels-peterfazekas-997131
ใƒ‰ใƒญใƒผใƒณ
pexels-cookiecutter-1148820
ใƒ†ใƒฌใ‚ณใƒ ใƒปใƒใƒƒใ‚ฏใ‚ขใƒƒใƒ—ใƒปใƒ‘ใƒฏใƒผ
Low-Speed Electric Vehicles
ไฝŽ้€Ÿ้›ปๆฐ—่‡ชๅ‹•่ปŠ
Compact RV Travel
RVใƒ‘ใƒฏใƒผ
forklift
ใƒ•ใ‚ฉใƒผใ‚ฏใƒชใƒ•ใƒˆ
Lead To Lithium Conversion
้‰›ใ‹ใ‚‰ใƒชใƒใ‚ฆใƒ ใธใฎๅค‰ๆ›

็ฉๅฑคๅž‹้ซ˜้›ปๅœงใƒใƒƒใƒ†ใƒชใƒผใƒ‘ใƒƒใ‚ฏ

This modular high-voltage system enables scalable energy storage capacity. Utilizing advanced battery technology, it offers a long cycle life and high operational efficiency. Ideal for large residential homes and commercial spaces that require higher storage volumes.

ใ‚นใ‚ฟใƒƒใ‚ญใƒณใ‚ฐๅฏ่ƒฝใช้ซ˜้›ปๅœงใƒใƒƒใƒ†ใƒชใƒผใƒ‘ใƒƒใ‚ฏ

ใ‚ทใ‚นใƒ†ใƒ ้›ปๅœง๏ผš409.6 V

ๅฎšๆ ผๅฎน้‡๏ผš50Ah

ใ‚ฐใƒชใƒƒใƒ‰ๆŽฅ็ถšใ‚ชใƒ•ใ‚ฐใƒชใƒƒใƒ‰ / ใƒใ‚คใƒ–ใƒชใƒƒใƒ‰

ใ‚ฟใ‚คใƒ—ใ‚นใƒ—ใƒชใƒƒใƒˆใ‚ฟใ‚คใƒ—๏ผˆใƒขใ‚ธใƒฅใƒฉใƒผ๏ผ‰

ใƒใƒƒใƒ†ใƒชใƒผใฎ็จฎ้กžLiFePOโ‚„ (ใƒชใƒณ้…ธ้‰„ใƒชใƒใ‚ฆใƒ )

้‡้‡๏ผš280.5ใ‚ญใƒญ

ๅฏธๆณ•480 ร— 132 ร— 586 mm

่ฃฝๅ“ใ‚ซใƒ†ใ‚ดใƒชใƒผ
็„กๆ–™่ฆ‹็ฉใ‚‚ใ‚Š
ใŠๅ•ใ„ๅˆใ‚ใ›ใƒ•ใ‚ฉใƒผใƒ ใƒ‡ใƒข (#3)

ใ‚ขใƒ—ใƒชใ‚ฑใƒผใ‚ทใƒงใƒณ

Villa Basement Energy Storage
ใƒดใ‚ฃใƒฉๅœฐไธ‹ใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต

Modular stackable design makes it easy to expand capacity to meet large home power needs.

Home Swimming Pool Power
Home Swimming Pool Power

High-voltage battery packs reliably run pumps and temperature control systems for worry-free swimming.

Home EV Charger Support
Home EV Charger Support

Balances high-power charging loads to protect your homeโ€™s electrical network.

Small Guesthouse Power Supply
Small Guesthouse Power Supply

Flexible expandable storage solutions to handle commercial-level power fluctuations.

Home Greenhouse Temperature Control
Home Greenhouse Temperature Control

Provides steady, continuous power to maintain a stable environment for plant growth.

DIY Energy Lab
DIY Energy Lab

High-voltage modular design to meet the custom needs of energy enthusiasts.

็„กๆ–™ใƒ‡ใ‚ถใ‚คใƒณ

ใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใ•ใ‚ŒใŸๅฐ‚็”จใƒใƒƒใƒ†ใƒชใƒผใƒ—ใƒฉใƒณใƒ—ใƒญใฎใ‚จใƒณใ‚ธใƒ‹ใ‚ขใŒใƒžใƒณใƒ„ใƒผใƒžใƒณใงใƒใƒƒใƒ†ใƒชใƒผใƒ—ใƒญใ‚ฐใƒฉใƒ ใ‚’ใƒ—ใƒฉใƒณใƒ‹ใƒณใ‚ฐใ€‚

ใ‚ชใƒผใƒ€ใƒผใƒกใ‚คใƒ‰ใฎใƒใƒƒใƒ†ใƒชใƒผใ‚ฝใƒชใƒฅใƒผใ‚ทใƒงใƒณใงใƒ‰ใƒญใƒผใƒณใฎๅŠนๆžœใ‚’ๆœ€ๅคงๅŒ–

EES-Propose-Requests
ใƒชใ‚ฏใ‚จใ‚นใƒˆใฎๆๆกˆ
Customized-Solution
ใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใƒปใ‚ฝใƒชใƒฅใƒผใ‚ทใƒงใƒณ
End-to-End-Controlled-Production-Testing
ใ‚จใƒณใƒ‰ใƒปใƒ„ใƒผใƒปใ‚จใƒณใƒ‰ใง็ฎก็†ใ•ใ‚ŒใŸ็”Ÿ็”ฃใจใƒ†ใ‚นใƒˆ
Warehouse-and-shipped-out
ๅ€‰ๅบซใ‹ใ‚‰ๅ‡บ่ท

Herewinใƒ•ใ‚กใ‚ฏใƒˆใƒชใƒผใ‚’ๆŽขใ‚‹๏ผšๅ“่ณชใฎๆบ

2019ๅนดใซ่จญ็ซ‹ใ•ใ‚ŒใŸShenzhen Jarwin Time Technology Co, Ltd.ใฏใ€ใƒใƒƒใƒ†ใƒชใƒผๆฅญ็•Œใง20ๅนดไปฅไธŠใฎ่ฑŠๅฏŒใช็ตŒ้จ“ใ‚’ๆŒใคๅ‰ตๆฅญใƒป้‹ๅ–ถใƒใƒผใƒ ใซๆ”ฏใˆใ‚‰ใ‚Œใฆใ„ใ‚‹ใ€‚้ซ˜ๆ€ง่ƒฝใƒชใƒใ‚ฆใƒ ใ‚คใ‚ชใƒณใƒใƒชใƒžใƒผ้›ปๆฑ ใฎ้–‹็™บใƒป็”Ÿ็”ฃใซ็‰นๅŒ–ใ—ใฆใ„ใ‚‹ใ€‚
็งใŸใกใŒไฝ•่€…ใงใ‚ใ‚Šใ€ไฝ•ใ‚’ๆจ™ๆฆœใ—ใฆใ„ใ‚‹ใฎใ‹ใ‚’ๅŒ…ๆ‹ฌ็š„ใซๆดžๅฏŸใ—ใฆใใ ใ•ใ„ใ€‚็งใŸใกใฎ็ทปๅฏ†ใงๆญฃ็ขบใช
็”Ÿ็”ฃใƒฉใ‚คใƒณใ€ๅทฅๅ ดใฎๅŠน็އ็š„ใช็ฎก็†ใ€ใใ—ใฆๆบ€่ถณใ—ใŸ้กงๅฎขใ‹ใ‚‰ใฎ็œŸใฎใƒ•ใ‚ฃใƒผใƒ‰ใƒใƒƒใ‚ฏใ€
็งใŸใกใŒใฉใฎใ‚ˆใ†ใซใƒ—ใƒญใ‚ปใ‚นใฎใ™ในใฆใฎๆฎต้šŽใงๅ“่ถŠๆ€งใ‚’ไฟ่จผใ—ใฆใ„ใ‚‹ใ‹ใŒใŠใ‚ใ‹ใ‚Šใ„ใŸใ ใ‘ใ‚‹ใงใ—ใ‚‡ใ†ใ€‚

ใ•ใพใ–ใพใชใƒ‘ใ‚ฟใƒผใƒณใฎ้กงๅฎขใซๅฏพใ™ใ‚‹ใ•ใพใ–ใพใชใ‚ตใƒผใƒ“ใ‚น

ใ‚ชใƒ•ใƒฉใ‚คใƒณ้กงๅฎขๅ‘ใ‘

ใƒ•ใƒฌใ‚ญใ‚ทใƒ–ใƒซใช็ดๆœŸ

็ขบๅฎŸใช้…้€ใ‚นใ‚ฑใ‚ธใƒฅใƒผใƒซใจๅ€‰ๅบซ็ฎก็†ใ‚ตใƒใƒผใƒˆใ€‚

้ซ˜ใ„่ฒป็”จๅฏพๅŠนๆžœ

ๅ…จไฝ“็š„ใชไพกๅ€คใ‚’ๆœ€ๅคงๅŒ–ใ™ใ‚‹ใŸใ‚ใฎ็ซถไบ‰ๅŠ›ใฎใ‚ใ‚‹ไพกๆ ผ่จญๅฎšใ€‚

ๅน…ๅบƒใ„่ฃฝๅ“ใ‚ปใƒฌใ‚ฏใ‚ทใƒงใƒณ

ใ‚ใ‚‰ใ‚†ใ‚‹ๅธ‚ๅ ดใ‚ปใ‚ฐใƒกใƒณใƒˆใซๅฏพๅฟœใ™ใ‚‹ๅคšๆง˜ใชใ‚ชใƒ—ใ‚ทใƒงใƒณใ€‚

ใ‚ชใƒณใƒฉใ‚คใƒณ้กงๅฎขๅ‘ใ‘

ไฝŽใ„MOQ

ๆททๅˆ่ฃฝๅ“ใ‚ชใƒ—ใ‚ทใƒงใƒณใงๆŸ”่ปŸใชMOQใ€‚

ใ‚ซใ‚นใ‚ฟใƒ ใƒญใ‚ด

ๅฐใƒญใƒƒใƒˆใงใ‚‚ใƒญใ‚ดใ‚’ใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใ€‚

ใƒฏใƒณใ‚นใƒˆใƒƒใƒ—ใƒปใƒžใƒผใ‚ฑใƒ†ใ‚ฃใƒณใ‚ฐใƒปใƒ‘ใƒƒใ‚ฑใƒผใ‚ธ

่ณชใฎ้ซ˜ใ„็”ปๅƒใ‚„ใƒ“ใƒ‡ใ‚ชใ‚’ๆไพ›ใ—ใ€่ฒฉๅฃฒๅŽ็›Šใ‚’้ซ˜ใ‚ใ‚‹ใ€‚

ใƒ–ใƒฉใƒณใƒ‰้กงๅฎขๅ‘ใ‘

็‹ฌๅ ๅœฐๅŸŸๆจฉ

ใƒ˜ใƒฌใ‚ฆใ‚ฃใƒณใฎใ™ในใฆใฎใƒชใ‚ฝใƒผใ‚นใจ่ƒฝๅŠ›ใ‚’ๆไพ›ใ™ใ‚‹

R&D Resources

Custom sample within 7 days with R&D capabilities.

่ฟ…้€Ÿใช้…้”

ๅŠน็އ็š„ใช็”Ÿ็”ฃใงใ€ๆœ€้€Ÿ25ๆ—ฅไปฅๅ†…ใซๅ‡บ่ทใ€‚

Production Flow of Home Energy Batteryโ€‹

Step1๏ผšUnpack-Materials
Step1๏ผšUnpack Materials

Open packaging, sort components.

Step2๏ผšFull-Visual-Inspection_
Step2๏ผšFull Visual Inspection

Inspect grouped cells for defects: leakage, scratches, dents, punctures, swelling.

Step3๏ผšVoltageResistance-Screening_
Step3๏ผšVoltage/Resistance Screening

Test cell voltage and internal resistance; rebalance cells with excessive voltage deviations.

Step4๏ผšTab-Punching
Step4๏ผšTab Punching

Punch holes in cell tabs using a stamping machine.

Step5๏ผšAdapter-Board-Assembly
Step5๏ผšAdapter Board Assembly

Mount cells onto adapter boards per specs, secure tightly with fiber tape.

Step6๏ผšTab-Alignment
Step6๏ผšTab Alignment

Fold tabs in half with a rubber mallet and align holes with PCB board positions.

Step7๏ผšScrew-Fastening
Step7๏ผšScrew Fastening

Secure aluminum plates to adapter boards with screws; verify torque.

Step8๏ผšFiberboard-Installation
Step8๏ผšFiberboard Installation

Wrap battery module with fiberboard and seal edges with fiber tape.

Step9๏ผšCasing-Integration
Step9๏ผšCasing Integration

Tilt module into lower casing, secure series wiring by loosening screws incrementally, apply silicone adhesive, fix top fiberboard, then fully insert into casing.

Step10๏ผšWiring-Connection
Step10๏ผšWiring Connection

Plug sensing wire terminals into sockets and secure with adhesive.

Step11๏ผšPerformance-Testing
Step11๏ผšPerformance Testing

Use a voltage tester to measure the maximum and minimum cell voltage difference of the battery pack (โ‰ค15 mV), followed by open-circuit voltage, AC impedance, and charge/discharge (including overcurrent) tests.

Step12๏ผšAging-Cycle
Step12๏ผšAging Cycle

Stabilize performance through cycling and screen for defects pre-final assembly.

Step13๏ผšCover-Installation
Step13๏ผšCover Installation

Attach top cover to casing with screws.

Step14๏ผšComprehensive-Functional-Testing
Step14๏ผšComprehensive Functional Testing

้€šไฟกใ€ๅ‡บๅŠ›้›ปๅœงใ€ๆธฉๅบฆๆคœ็Ÿฅใ€ๆ”พ้›ปๆ›ฒ็ทšใ€ๆผใ‚Œใ‚’็ขบ่ชใ™ใ‚‹ใ€‚

Step15๏ผšFinal-Visual-QA
Step15๏ผšFinal Visual QA

Inspect surface for flaws, check display buttons for smooth operation (no sticking).

Step16๏ผšPackaging
Step16๏ผšPackaging

Label units, place in foam-lined boxes, seal in PE bags with desiccant, add top foam padding.

Step17๏ผšShipping
Step17๏ผšShipping

ๆ‰ฟ่ชใ•ใ‚ŒใŸใƒฆใƒ‹ใƒƒใƒˆใ‚’็ฎฑ่ฉฐใ‚ใ—ใ€ๆดพ้ฃใ™ใ‚‹ใ€‚

่ฉณ็ดฐ

่ฃฝ้€ ใฎ่ฉณ็ดฐใจ่ฃฝ้€ ๅทฅ็จ‹ใซใคใ„ใฆใฏใ“ใกใ‚‰

ใƒ†ใ‚นใƒˆใƒ—ใƒญใ‚ปใ‚น

ใƒ•ใ‚งใ‚ข๏ผ†ใ‚ตใƒผใƒ†ใ‚ฃใƒ•ใ‚ฃใ‚ฑใƒผใ‚ทใƒงใƒณ

่ชๅฎš่ณ‡ๆ ผใฏherewinใฎๆœ€ๅคงใฎๅผทใฟใ ใ€‚
ใ‚ใ‚‰ใ‚†ใ‚‹ๅธ‚ๅ ดใฎใƒ‹ใƒผใ‚บใซๅฏพๅฟœใ—ใ€ไพ›็ตฆๅ…ƒๅทฅๅ ดใฏๅ“่ณชใ‚’ไฟ่จผใ™ใ‚‹ใŸใ‚ใซๅฎŒๅ…จใซ่ช่จผใ•ใ‚Œใฆใ„ใ‚‹ใ€‚

Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title

้€ฃ็ตกๅ…ˆ

ใ‚ใชใŸใฎๅธ‚ๅ ดใŒๅฟ…่ฆใจใ™ใ‚‹ใ‚ฏใƒฌใƒ‡ใƒณใ‚ทใƒฃใƒซใ‚’็Ÿฅใ‚ŠใŸใ„ใงใ™ใ‹๏ผŸ้ซ˜่งฃๅƒๅบฆใฎ็”ปๅƒใ‚’ใŠ้€ใ‚Šใ—ใพใ™ใ€‚

้–ข้€ฃใ‚ซใƒ†ใ‚ดใƒชใƒผ

Drone-Battery-
Battery-Cells-1
Semi-Solid State Drone Battery
Industrial-EV-Battery-Packs
Commercial-Industrial-Energy-Storage-Solutions-4

ใ‚ˆใใ‚ใ‚‹ใ”่ณชๅ•

Will running multiple high-power devices (air conditioning, underfloor heating) at the same time cause overload in a villa backup power setup?

The fully-featured deluxe villa backup power model (48V 600Ah+) is built to support high-power output for large homes. To optimize usage, we recommend setting device prioritiesโ€”powering essentials like security systems and the fridge first, then air conditioning. Alternatively, choose the smart load management version, which automatically distributes power based on real-time demand.

้–ข้€ฃใƒ–ใƒญใ‚ฐ

Compare Li-Po, LiFePO4, and solid-state batteries for industrial drones in 2026. Explore energy density, safety, cycle life, cost, and real-world applications to choose the best battery for endurance, high-temperature, and high-frequency operations.
University drone lab with supervised battery charging, modular packs, and smart BMS monitoring on a tablet
A technical framework for university drone labs. Optimize 1S-16S modular power, ensure zero-incident student operations, and meet MIT/U-Michigan EHS safety standards.
Wildfire drone base at dusk with UAVs, charging racks, and distant fire glow
Engineering guide for wildfire UAV missions. Explore semi-solid battery thermal stability, dendrite suppression, and mission-critical power for 55ยฐC extreme environments.
Maximize hectares/day and VRA spray precision in 35โ€“40ยฐC heat. 2026 technical guide to semi-solid battery tech, voltage stability, and agricultural fleet ROI.
Industrial drone battery on compliance test bench with checklist and Class 9 label
Definitive 2026 guide to industrial drone battery complianceโ€”EN 62619 vs EN 62133, UN38.3, CE/UKCA, audit playbook and a sample Complete Compliance Pack. Download now.
Industrial drone lifting off in snowy disaster zone at dawn, showing self-heating battery readiness
Comprehensive ultimate guide to emergency response drone batteriesโ€”selfโ€‘heating coldโ€‘start at โˆ’20ยฐC, smart BMS, reproducible test protocols and RFQ checklist. Read now.

ๆ–ฐใ‚ซใ‚ฟใƒญใ‚ฐ

Learn more about Home Energy Storage solutions, and the full range of products

jaๆ—ฅๆœฌ่ชž
ใƒˆใƒƒใƒ—ใซๆˆปใ‚‹

ไปŠใ™ใ็„กๆ–™ใŠ่ฆ‹็ฉใ‚‚ใ‚Šใ‚’ ๏ผ

ใŠๅ•ใ„ๅˆใ‚ใ›ใƒ•ใ‚ฉใƒผใƒ ใƒ‡ใƒข (#3)
ใ”ไธๆ˜Žใช็‚นใŒใ”ใ–ใ„ใพใ—ใŸใ‚‰ใ€ใŠๆฐ—่ปฝใซใŠๅ•ใ„ๅˆใ‚ใ›ใใ ใ•ใ„ใ€‚