Commercial and industrial energy storage
์ƒ์—…์šฉ ๋ฐ ์‚ฐ์—…์šฉ ์—๋„ˆ์ง€ ์Šคํ† ๋ฆฌ์ง€
1737451508966
ํ™ˆ ์—๋„ˆ์ง€ ์Šคํ† ๋ฆฌ์ง€
pexels-peterfazekas-997131
๋“œ๋ก 
pexels-cookiecutter-1148820
ํ†ต์‹  ๋ฐฑ์—… ์ „์›
Low-Speed Electric Vehicles
์ €์† ์ „๊ธฐ ์ž๋™์ฐจ
Compact RV Travel
RV ํŒŒ์›Œ
forklift
์ง€๊ฒŒ์ฐจ
Lead To Lithium Conversion
๋ฆฌํŠฌ ์ „ํ™˜์œผ๋กœ ๋ฆฌ๋“œ

๊ณต๋žญ์‹ ์—๋„ˆ์ง€ ์ €์žฅ ์‹œ์Šคํ…œ

Durable and simple air-cooling structure with intelligent thermal management. A cost-effective solution ideal for small to medium-sized energy storage projects.

๊ณต๋žญ์‹ ์—๋„ˆ์ง€ ์ €์žฅ ์‹œ์Šคํ…œ

๊ณต์นญ ์ „์••: DC 1280V

์—๋„ˆ์ง€ ์šฉ๋Ÿ‰: 5017.6kWh

์น˜์ˆ˜ 13,716 ร— 2,438 ร— 2,896 mm

๋ฌด๊ฒŒ: ~50ํ†ค

์ œํ’ˆ ์นดํ…Œ๊ณ ๋ฆฌ
๋ฌด๋ฃŒ ๊ฒฌ์  ๋ฐ›๊ธฐ
๋ฌธ์˜ ์–‘์‹ ๋ฐ๋ชจ(#3)

์• ํ”Œ๋ฆฌ์ผ€์ด์…˜

Distributed PV Integration
Distributed PV Integration

Lightweight air-cooled design flexibly adapts to rooftop solar systems.

EV Charging Lot Storage
EV Charging Lot Storage

Natural convection cooling ensures safe and stable operation of charging stations.

Community Microgrids
Community Microgrids

Low-noise operation avoids disturbance, enabling shared energy use among neighbors.

School Gymnasium Power Supply
School Gymnasium Power Supply

Low-maintenance solution that balances HVAC energy usage during peak and off-peak hours.

Small Hydropower Frequency Regulation
Small Hydropower Frequency Regulation

Air cooling works well in humid environments, supporting turbine output adjustments.

Modular Power for Prefab Buildings
Modular Power for Prefab Buildings

Quick-to-deploy air-cooled units provide reliable temporary power for mobile or modular construction.

๋ฌด๋ฃŒ ๋””์ž์ธ

๋งž์ถคํ˜• ์ „์šฉ ๋ฐฐํ„ฐ๋ฆฌ ํ”Œ๋žœ! ์ „๋ฌธ ์—”์ง€๋‹ˆ์–ด๊ฐ€ ์ผ๋Œ€์ผ๋กœ ๋ฐฐํ„ฐ๋ฆฌ ํ”„๋กœ๊ทธ๋žจ์„ ๊ณ„ํšํ•ฉ๋‹ˆ๋‹ค.

๋งž์ถคํ˜• ๋ฐฐํ„ฐ๋ฆฌ ์†”๋ฃจ์…˜์œผ๋กœ ๋“œ๋ก  ํšจ๊ณผ ๊ทน๋Œ€ํ™”

EES-Propose-Requests
์š”์ฒญ ์ œ์•ˆ
Customized-Solution
๋งž์ถคํ˜• ์†”๋ฃจ์…˜
End-to-End-Controlled-Production-Testing
์—”๋“œํˆฌ์—”๋“œ ์ œ์–ด ์ƒ์‚ฐ ๋ฐ ํ…Œ์ŠคํŠธ
Warehouse-and-shipped-out
์ฐฝ๊ณ  ์ž…๊ณ  ๋ฐ ๋ฐฐ์†ก

ํ—ค๋ ˆ์œˆ ํŒฉํ† ๋ฆฌ ์‚ดํŽด๋ณด๊ธฐ: ํ’ˆ์งˆ์˜ ์›์ฒœ

2019๋…„์— ์„ค๋ฆฝ๋œ ์‹ฌ์ฒœ ์ž์œˆ ํƒ€์ž„ ํ…Œํฌ๋†€๋กœ์ง€๋Š” ๋ฐฐํ„ฐ๋ฆฌ ์—…๊ณ„์—์„œ 20๋…„ ์ด์ƒ์˜ ํญ๋„“์€ ๊ฒฝํ—˜์„ ๊ฐ€์ง„ ์„ค๋ฆฝ ๋ฐ ์šด์˜ ํŒ€์˜ ์ง€์›์„ ๋ฐ›๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๊ณ ์„ฑ๋Šฅ ๋ฆฌํŠฌ ์ด์˜จ ํด๋ฆฌ๋จธ ๋ฐฐํ„ฐ๋ฆฌ์˜ ๊ฐœ๋ฐœ ๋ฐ ์ƒ์‚ฐ์„ ์ „๋ฌธ์œผ๋กœ ํ•ฉ๋‹ˆ๋‹ค.
Facebook์ด ๋ˆ„๊ตฌ์ด๋ฉฐ ๋ฌด์—‡์„ ์ง€ํ–ฅํ•˜๋Š”์ง€์— ๋Œ€ํ•œ ํฌ๊ด„์ ์ธ ์ธ์‚ฌ์ดํŠธ๋ฅผ ์–ป์œผ์„ธ์š”. ์„ธ์‹ฌํ•œ ์ •ํ™•์„ฑ์„ ์ž๋ž‘ํ•˜๋Š” ์ €ํฌ์˜
์ƒ์‚ฐ ๋ผ์ธ, ๊ณต์žฅ์˜ ํšจ์œจ์ ์ธ ๊ด€๋ฆฌ, ๋งŒ์กฑํ•œ ๊ณ ๊ฐ๋“ค์˜ ์ง„์ •ํ•œ ํ”ผ๋“œ๋ฐฑ์ด ์žˆ์—ˆ๊ธฐ์— ๊ฐ€๋Šฅํ–ˆ์Šต๋‹ˆ๋‹ค,
ํ”„๋กœ์„ธ์Šค์˜ ๋ชจ๋“  ๋‹จ๊ณ„์—์„œ ์šฐ์ˆ˜์„ฑ์„ ๋ณด์žฅํ•˜๋Š” ๋ฐฉ๋ฒ•์„ ํ™•์ธํ•  ์ˆ˜ ์žˆ์Šต๋‹ˆ๋‹ค.

๋‹ค์–‘ํ•œ ํŒจํ„ด์˜ ๊ณ ๊ฐ์„ ์œ„ํ•œ ๋‹ค์–‘ํ•œ ์„œ๋น„์Šค

์˜คํ”„๋ผ์ธ ๊ณ ๊ฐ์šฉ

์œ ์—ฐํ•œ ๋ฐฐ์†ก ์‹œ๊ฐ„

์•ˆ์ •์ ์ธ ๋ฐฐ์†ก ์ผ์ • ๋ฐ ์ฐฝ๊ณ  ์ง€์›.

๋†’์€ ๋น„์šฉ ํšจ์œจ์„ฑ

์ „์ฒด ๊ฐ€์น˜๋ฅผ ๊ทน๋Œ€ํ™”ํ•˜๋Š” ๊ฒฝ์Ÿ๋ ฅ ์žˆ๋Š” ๊ฐ€๊ฒฉ.

๋‹ค์–‘ํ•œ ์ œํ’ˆ ์„ ํƒ

๋ชจ๋“  ์‹œ์žฅ ๋ถ€๋ฌธ์„ ์ถฉ์กฑํ•˜๋Š” ๋‹ค์–‘ํ•œ ์˜ต์…˜.

์˜จ๋ผ์ธ ๊ณ ๊ฐ์šฉ

๋‚ฎ์€ MOQ

ํ˜ผํ•ฉ ์ œํ’ˆ ์˜ต์…˜์œผ๋กœ ์œ ์—ฐํ•œ MOQ.

์‚ฌ์šฉ์ž ์ง€์ • ๋กœ๊ณ 

์†Œ๊ทœ๋ชจ ๋ฐฐ์น˜๋ฅผ ์œ„ํ•œ ๋งž์ถคํ˜• ๋กœ๊ณ  ์‚ฌ์šฉ์ž ์ง€์ •.

์›์Šคํ†ฑ ๋งˆ์ผ€ํŒ… ํŒจํ‚ค์ง€

๊ณ ํ’ˆ์งˆ ์ด๋ฏธ์ง€, ๋™์˜์ƒ์„ ์ œ๊ณตํ•˜์—ฌ ํŒ๋งค ์ˆ˜์ต์„ ๋†’์ผ ์ˆ˜ ์žˆ์Šต๋‹ˆ๋‹ค.

๋ธŒ๋žœ๋“œ ๊ณ ๊ฐ์šฉ

์ง€์—ญ ๋…์  ๊ถŒํ•œ

ํ—ค๋ฆฌ์œˆ์˜ ๋ชจ๋“  ๋ฆฌ์†Œ์Šค ๋ฐ ๊ธฐ๋Šฅ ์ œ๊ณต

R&D Resources

Custom sample within 7 days with R&D capabilities.

๋น ๋ฅธ ๋ฐฐ์†ก

ํšจ์œจ์ ์ธ ์ƒ์‚ฐ์œผ๋กœ ์ตœ๋‹จ 25์ผ ์ด๋‚ด์— ๋ฐฐ์†กํ•ฉ๋‹ˆ๋‹ค.

Production Flow of Commercial &Industrial Energy Batteryโ€‹

Cell Incoming Inspection
Step1๏ผšCell Incoming Inspection

Verify all incoming cell parameters to ensure they meet quality standards and determine whether the cells are suitable for subsequent production.

OCV Sorting
Step2๏ผšOCV Sorting

Test and classify cells based on open-circuit voltage (OCV) and internal resistance parameters.

Plasma Cleaning
Step3๏ผšPlasma Cleaning

Remove dirt, dust, and surface impurities from cells to ensure a clean surface condition for assembly.

Module Stacking
Step4๏ผšModule Stacking

Stack cells in sequence to form modules, apply compression, and install steel bands at the top and bottom of the module.

Busbar Laser Welding
Step5๏ผšBusbar Laser Welding

Install insulated busbar plates onto the module, then perform laser welding and inspect weld quality.

Wire Harness Welding
Step6๏ผšWire Harness Welding

Assemble sampling wire harnesses sequentially, perform laser welding, and conduct visual inspection to ensure welding and assembly quality.

Module Performance Testing
Step7๏ผšModule Performance Testing

Conduct performance testing on the module to evaluate whether it meets all required technical specifications.

Pre-Assembly Processing
Step8๏ผšPre-Assembly Processing

Pre-process components including the connector mounting plate, maintenance cover seal strips, and mounting brackets.

Enclosure Cleaning
Step9๏ผšEnclosure Cleaning

Clean the battery enclosure to remove dust, debris, and other contaminants, keeping both the interior and exterior clean.

Module Installation into Enclosure
Step10๏ผšModule Installation into Enclosure

Place the module into the enclosure and arrange the wire harnesses neatly to ensure an orderly layout.

Step11๏ผšEOL (End-of-Line) Testing

Conduct end-of-line testing to verify overall performance and ensure compliance with product standards.

Top Cover Installation
Step12๏ผšTop Cover Installation

Position and install the top cover securely to complete final assembly.

Sealing and Final Inspection
Step13๏ผšSealing and Final Inspection

Perform airtightness testing on the enclosure to verify sealing integrity, followed by final offline product inspection to confirm full compliance with release criteria.

์ž์„ธํžˆ ์•Œ์•„๋ณด๊ธฐ

์ƒ์‚ฐ ์„ธ๋ถ€ ์ •๋ณด ๋ฐ ์ œ์กฐ ๊ณต์ •์— ๋Œ€ํ•ด ์ž์„ธํžˆ ์•Œ์•„๋ณด๊ธฐ

ํ…Œ์ŠคํŠธ ํ”„๋กœ์„ธ์Šค

๊ณต์ • ๋ฐ ์ธ์ฆ

์ธ์ฆ์€ ํ—ค๋ฆฌ์œˆ์˜ ๊ฐ€์žฅ ํฐ ๊ฐ•์ ์ž…๋‹ˆ๋‹ค.
๋ชจ๋“  ์‹œ์žฅ์˜ ์š”๊ตฌ ์‚ฌํ•ญ์„ ์ถฉ์กฑํ•˜๋ฉฐ, ์†Œ์Šค ๊ณต์žฅ์€ ํ’ˆ์งˆ์„ ๋ณด์žฅํ•˜๊ธฐ ์œ„ํ•ด ์™„์ „ํ•œ ์ธ์ฆ์„ ๋ฐ›์•˜์Šต๋‹ˆ๋‹ค.

Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title

์—ฐ๋ฝํ•˜๊ธฐ

์‹œ์žฅ์— ํ•„์š”ํ•œ ์ž๊ฒฉ ์ฆ๋ช…์ด ๋ฌด์—‡์ธ์ง€ ์•Œ๊ณ  ์‹ถ์œผ์‹ ๊ฐ€์š”? ๊ณ ํ•ด์ƒ๋„ ์ด๋ฏธ์ง€๋ฅผ ๋ณด๋‚ด๋“œ๋ฆฌ๋ ค๋ฉด ์—ฐ๋ฝ์ฃผ์„ธ์š”.

๊ด€๋ จ ์นดํ…Œ๊ณ ๋ฆฌ

Drone-Battery-
Battery-Cells-1
Home-Energy-Storage-Solutions-2
Semi-Solid State Drone Battery
Industrial-EV-Battery-Packs

์ž์ฃผ ๋ฌป๋Š” ์งˆ๋ฌธ

Will using a C&I energy storage battery affect grid stability?

It helps enhance grid stability. During peak demand, the C&I energy storage battery supplies power to the facility, reducing the strain on the grid. During off-peak hours, it recharges, helping balance the overall load on the power network.

๊ด€๋ จ ๋ธ”๋กœ๊ทธ

Illustration of drone logistics energy infrastructure as a modular dock network backbone.
A COO-ready framework to reduce variance, expose iceberg TCO, and build deterministic, interoperable energy backbones for drone logistics.
Capa โ€” bateria para drone agrรญcola 350 Wh/kg em altitude em Minas Gerais
Compare caminhos tรฉcnicos para operar drones agrรญcolas em altitude: margem de sustentaรงรฃo, risco tรฉrmico e TCO com premissas claras.
Technical diagram cover of a mobile BESS showing battery pack, PCS, and EMS
Learn what a mobile BESS is, how it works, key components, and sizing logicโ€”written for microgrid EPC engineers focused on integration.
Compare 4S, 6S, 12S, and 14S batteries by power, heat, and efficiency. Learn how voltage affects performance in drones, RC models, and industrial systems.
Cover image illustrating drone battery voltage sag in industrial UAV power systems
Detect voltage sag early, understand IR and temperature effects, and evaluate batteries/BMS for predictable heavy-lift UAV missions.
CTO-focused guide to evaluate 100โ€“200kg UAV redundant battery architectures, failure modes, BMS fault isolation, thermal risk, and ROI.

์ƒˆ๋กœ์šด ์นดํƒˆ๋กœ๊ทธ

Learn more about Commercial &Industrial Energy Storage Solutions, and the full range of products

ko_KRํ•œ๊ตญ์–ด
๋งจ ์œ„๋กœ ์Šคํฌ๋กค

์ง€๊ธˆ ๋ฌด๋ฃŒ ๊ฒฌ์  ๋ฐ›๊ธฐ!

๋ฌธ์˜ ์–‘์‹ ๋ฐ๋ชจ(#3)
๊ถ๊ธˆํ•œ ์ ์ด ์žˆ์œผ์‹œ๋ฉด ์–ธ์ œ๋“ ์ง€ ๋ฌธ์˜ํ•ด ์ฃผ์„ธ์š”.