Commercial and industrial energy storage
ๅ•†ๆฅญใƒป็”ฃๆฅญ็”จใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต
Herewin Home Energy Storage Battery
ๅฎถๅบญ็”จใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต
488642711_1278865830906565_7716202339252007488_n
ใƒ‰ใƒญใƒผใƒณ
pexels-cookiecutter-1148820
ใƒ†ใƒฌใ‚ณใƒ ใƒปใƒใƒƒใ‚ฏใ‚ขใƒƒใƒ—ใƒปใƒ‘ใƒฏใƒผ
Low-Speed Electric Vehicles
ไฝŽ้€Ÿ้›ปๆฐ—่‡ชๅ‹•่ปŠ
Compact RV Travel
RVใƒ‘ใƒฏใƒผ
forklift
ใƒ•ใ‚ฉใƒผใ‚ฏใƒชใƒ•ใƒˆ
Lead To Lithium Conversion
้‰›ใ‹ใ‚‰ใƒชใƒใ‚ฆใƒ ใธใฎๅค‰ๆ›

ใ‚นใƒžใƒผใƒˆใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต๏ผ†EVๅ……้›ปใ‚ทใ‚นใƒ†ใƒ 

An integrated system combining energy storage, solar power, and EV fast charging. Enables intelligent energy scheduling and supports green energy efficiency for electric vehicle infrastructure.

ใ‚นใƒžใƒผใƒˆใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ต๏ผ†EVๅ……้›ปใ‚ทใ‚นใƒ†ใƒ 

ๅ‡บๅŠ›้›ปๅœงDC 200 V - 750 V

ใ‚จใƒใƒซใ‚ฎใƒผๅฎน้‡๏ผš61kWh

ๅฏธๆณ•1580 ร— 965 ร— 1050 mm

้‡้‡๏ผš๏ฝž840kg

่ฃฝๅ“ใ‚ซใƒ†ใ‚ดใƒชใƒผ
็„กๆ–™่ฆ‹็ฉใ‚‚ใ‚Š
ใŠๅ•ใ„ๅˆใ‚ใ›ใƒ•ใ‚ฉใƒผใƒ ใƒ‡ใƒข (#3)

ใ‚ขใƒ—ใƒชใ‚ฑใƒผใ‚ทใƒงใƒณ

All-in-One Solar, Storage & Charging Station
All-in-One Solar, Storage & Charging Station

Combines solar power, buffer storage, and intelligent EV charging to deliver zero-carbon energy solutions.

Logistics Park Charging & Storage
Logistics Park Charging & Storage

Dynamically balances charging loads from electric forklifts to reduce peak demand charges.

Highway Service Areas
Highway Service Areas

AI-powered scheduling enables multi-port fast charging while easing grid expansion pressure.

Shared Battery Swap Stations
Shared Battery Swap Stations

Smart management of second-life batteries extends overall battery lifecycle value.

Bus Depot Energy Storage
Bus Depot Energy Storage

Off-peak charging aligned with fleet dispatch curves cuts operational costs by up to 30%.

Campus Virtual Power Plants (VPP)
Campus Virtual Power Plants (VPP)

Aggregates distributed energy storage for grid participation and generates additional revenue through energy trading.

็„กๆ–™ใƒ‡ใ‚ถใ‚คใƒณ

ใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใ•ใ‚ŒใŸๅฐ‚็”จใƒใƒƒใƒ†ใƒชใƒผใƒ—ใƒฉใƒณใƒ—ใƒญใฎใ‚จใƒณใ‚ธใƒ‹ใ‚ขใŒใƒžใƒณใƒ„ใƒผใƒžใƒณใงใƒใƒƒใƒ†ใƒชใƒผใƒ—ใƒญใ‚ฐใƒฉใƒ ใ‚’ใƒ—ใƒฉใƒณใƒ‹ใƒณใ‚ฐใ€‚

ใ‚ชใƒผใƒ€ใƒผใƒกใ‚คใƒ‰ใฎใƒใƒƒใƒ†ใƒชใƒผใ‚ฝใƒชใƒฅใƒผใ‚ทใƒงใƒณใงใƒ‰ใƒญใƒผใƒณใฎๅŠนๆžœใ‚’ๆœ€ๅคงๅŒ–

EES-Propose-Requests
ใƒชใ‚ฏใ‚จใ‚นใƒˆใฎๆๆกˆ
Customized-Solution
ใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใƒปใ‚ฝใƒชใƒฅใƒผใ‚ทใƒงใƒณ
End-to-End-Controlled-Production-Testing
ใ‚จใƒณใƒ‰ใƒปใƒ„ใƒผใƒปใ‚จใƒณใƒ‰ใง็ฎก็†ใ•ใ‚ŒใŸ็”Ÿ็”ฃใจใƒ†ใ‚นใƒˆ
Warehouse-and-shipped-out
ๅ€‰ๅบซใ‹ใ‚‰ๅ‡บ่ท

Herewinใƒ•ใ‚กใ‚ฏใƒˆใƒชใƒผใ‚’ๆŽขใ‚‹๏ผšๅ“่ณชใฎๆบ

2019ๅนดใซ่จญ็ซ‹ใ•ใ‚ŒใŸShenzhen Jarwin Time Technology Co, Ltd.ใฏใ€ใƒใƒƒใƒ†ใƒชใƒผๆฅญ็•Œใง20ๅนดไปฅไธŠใฎ่ฑŠๅฏŒใช็ตŒ้จ“ใ‚’ๆŒใคๅ‰ตๆฅญใƒป้‹ๅ–ถใƒใƒผใƒ ใซๆ”ฏใˆใ‚‰ใ‚Œใฆใ„ใ‚‹ใ€‚้ซ˜ๆ€ง่ƒฝใƒชใƒใ‚ฆใƒ ใ‚คใ‚ชใƒณใƒใƒชใƒžใƒผ้›ปๆฑ ใฎ้–‹็™บใƒป็”Ÿ็”ฃใซ็‰นๅŒ–ใ—ใฆใ„ใ‚‹ใ€‚
็งใŸใกใŒไฝ•่€…ใงใ‚ใ‚Šใ€ไฝ•ใ‚’ๆจ™ๆฆœใ—ใฆใ„ใ‚‹ใฎใ‹ใ‚’ๅŒ…ๆ‹ฌ็š„ใซๆดžๅฏŸใ—ใฆใใ ใ•ใ„ใ€‚็งใŸใกใฎ็ทปๅฏ†ใงๆญฃ็ขบใช
็”Ÿ็”ฃใƒฉใ‚คใƒณใ€ๅทฅๅ ดใฎๅŠน็އ็š„ใช็ฎก็†ใ€ใใ—ใฆๆบ€่ถณใ—ใŸ้กงๅฎขใ‹ใ‚‰ใฎ็œŸใฎใƒ•ใ‚ฃใƒผใƒ‰ใƒใƒƒใ‚ฏใ€
็งใŸใกใŒใฉใฎใ‚ˆใ†ใซใƒ—ใƒญใ‚ปใ‚นใฎใ™ในใฆใฎๆฎต้šŽใงๅ“่ถŠๆ€งใ‚’ไฟ่จผใ—ใฆใ„ใ‚‹ใ‹ใŒใŠใ‚ใ‹ใ‚Šใ„ใŸใ ใ‘ใ‚‹ใงใ—ใ‚‡ใ†ใ€‚

ใ•ใพใ–ใพใชใƒ‘ใ‚ฟใƒผใƒณใฎ้กงๅฎขใซๅฏพใ™ใ‚‹ใ•ใพใ–ใพใชใ‚ตใƒผใƒ“ใ‚น

ใ‚ชใƒ•ใƒฉใ‚คใƒณ้กงๅฎขๅ‘ใ‘

ใƒ•ใƒฌใ‚ญใ‚ทใƒ–ใƒซใช็ดๆœŸ

็ขบๅฎŸใช้…้€ใ‚นใ‚ฑใ‚ธใƒฅใƒผใƒซใจๅ€‰ๅบซ็ฎก็†ใ‚ตใƒใƒผใƒˆใ€‚

้ซ˜ใ„่ฒป็”จๅฏพๅŠนๆžœ

ๅ…จไฝ“็š„ใชไพกๅ€คใ‚’ๆœ€ๅคงๅŒ–ใ™ใ‚‹ใŸใ‚ใฎ็ซถไบ‰ๅŠ›ใฎใ‚ใ‚‹ไพกๆ ผ่จญๅฎšใ€‚

ๅน…ๅบƒใ„่ฃฝๅ“ใ‚ปใƒฌใ‚ฏใ‚ทใƒงใƒณ

ใ‚ใ‚‰ใ‚†ใ‚‹ๅธ‚ๅ ดใ‚ปใ‚ฐใƒกใƒณใƒˆใซๅฏพๅฟœใ™ใ‚‹ๅคšๆง˜ใชใ‚ชใƒ—ใ‚ทใƒงใƒณใ€‚

ใ‚ชใƒณใƒฉใ‚คใƒณ้กงๅฎขๅ‘ใ‘

ไฝŽใ„MOQ

ๆททๅˆ่ฃฝๅ“ใ‚ชใƒ—ใ‚ทใƒงใƒณใงๆŸ”่ปŸใชMOQใ€‚

ใ‚ซใ‚นใ‚ฟใƒ ใƒญใ‚ด

ๅฐใƒญใƒƒใƒˆใงใ‚‚ใƒญใ‚ดใ‚’ใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใ€‚

ใƒฏใƒณใ‚นใƒˆใƒƒใƒ—ใƒปใƒžใƒผใ‚ฑใƒ†ใ‚ฃใƒณใ‚ฐใƒปใƒ‘ใƒƒใ‚ฑใƒผใ‚ธ

่ณชใฎ้ซ˜ใ„็”ปๅƒใ‚„ใƒ“ใƒ‡ใ‚ชใ‚’ๆไพ›ใ—ใ€่ฒฉๅฃฒๅŽ็›Šใ‚’้ซ˜ใ‚ใ‚‹ใ€‚

ใƒ–ใƒฉใƒณใƒ‰้กงๅฎขๅ‘ใ‘

็‹ฌๅ ๅœฐๅŸŸๆจฉ

ใƒ˜ใƒฌใ‚ฆใ‚ฃใƒณใฎใ™ในใฆใฎใƒชใ‚ฝใƒผใ‚นใจ่ƒฝๅŠ›ใ‚’ๆไพ›ใ™ใ‚‹

R&D Resources

Custom sample within 7 days with R&D capabilities.

่ฟ…้€Ÿใช้…้”

ๅŠน็އ็š„ใช็”Ÿ็”ฃใงใ€ๆœ€้€Ÿ25ๆ—ฅไปฅๅ†…ใซๅ‡บ่ทใ€‚

ๅ•†ๆฅญ็”จใƒป็”ฃๆฅญ็”จใ‚จใƒใƒซใ‚ฎใƒผ้›ปๆฑ ใฎ่ฃฝ้€ ใƒ•ใƒญใƒผ

Cell Incoming Inspection
Step1๏ผšใ‚ปใƒซ็€ไฟกๆคœๆŸป

ๅ…ฅ่ทใ—ใŸใ‚ปใƒซใฎใƒ‘ใƒฉใƒกใƒผใ‚ฟใƒผใ‚’ใ™ในใฆๆคœ่จผใ—ใ€ๅ“่ณชๅŸบๆบ–ใ‚’ๆบ€ใŸใ—ใฆใ„ใ‚‹ใ“ใจใ‚’็ขบ่ชใ—ใ€ใใฎๅพŒใฎ็”Ÿ็”ฃใซ้ฉใ—ใฆใ„ใ‚‹ใ‹ใฉใ†ใ‹ใ‚’ๅˆคๆ–ญใ™ใ‚‹ใ€‚

OCV Sorting
ใ‚นใƒ†ใƒƒใƒ—2๏ผšOCVใ‚ฝใƒผใƒˆ

้–‹ๆ”พ้›ปๅœง๏ผˆOCV๏ผ‰ใจๅ†…้ƒจๆŠตๆŠ—ใฎใƒ‘ใƒฉใƒกใƒผใ‚ฟใซๅŸบใฅใ„ใฆใ‚ปใƒซใ‚’ใƒ†ใ‚นใƒˆใ—ใ€ๅˆ†้กžใ™ใ‚‹ใ€‚

Plasma Cleaning
Step3๏ผšใƒ—ใƒฉใ‚บใƒžๆด—ๆต„

ใ‚ปใƒซใ‹ใ‚‰ๆฑšใ‚Œใ€ใปใ“ใ‚Šใ€่กจ้ขใฎไธ็ด”็‰ฉใ‚’ๅ–ใ‚Š้™คใใ€็ต„ใฟ็ซ‹ใฆใฎใŸใ‚ใฎใใ‚Œใ„ใช่กจ้ข็Šถๆ…‹ใ‚’็ขบไฟใ™ใ‚‹ใ€‚

Module Stacking
Step4๏ผšใƒขใ‚ธใƒฅใƒผใƒซใ‚นใ‚ฟใƒƒใ‚ญใƒณใ‚ฐ

ใ‚ปใƒซใ‚’้ †็•ชใซ็ฉใฟ้‡ใญใฆใƒขใ‚ธใƒฅใƒผใƒซใ‚’ๅฝขๆˆใ—ใ€ๅœง็ธฎใ‚’ใ‹ใ‘ใ€ใƒขใ‚ธใƒฅใƒผใƒซใฎไธŠ้ƒจใจไธ‹้ƒจใซใ‚นใƒใƒผใƒซใƒใƒณใƒ‰ใ‚’ๅ–ใ‚Šไป˜ใ‘ใ‚‹ใ€‚

Busbar Laser Welding
Step5๏ผšใƒใ‚นใƒใƒผใƒฌใƒผใ‚ถใƒผๆบถๆŽฅ

็ตถ็ธใƒใ‚นใƒใƒผใƒ—ใƒฌใƒผใƒˆใ‚’ใƒขใ‚ธใƒฅใƒผใƒซใซๅ–ใ‚Šไป˜ใ‘ใ€ใƒฌใƒผใ‚ถใƒผๆบถๆŽฅใ‚’่กŒใ„ใ€ๆบถๆŽฅๅ“่ณชใ‚’ๆคœๆŸปใ™ใ‚‹ใ€‚

Wire Harness Welding
Step6๏ผšใƒฏใ‚คใƒคใƒผใƒใƒผใƒใ‚นๆบถๆŽฅ

ใ‚ตใƒณใƒ—ใƒชใƒณใ‚ฐใƒฏใ‚คใƒคใƒผใƒใƒผใƒใ‚นใ‚’้ †ๆฌก็ต„ใฟ็ซ‹ใฆใ€ใƒฌใƒผใ‚ถใƒผๆบถๆŽฅใ‚’่กŒใ„ใ€ๆบถๆŽฅใจ็ต„ใฟ็ซ‹ใฆใฎๅ“่ณชใ‚’็ขบไฟใ™ใ‚‹ใŸใ‚ใฎ็›ฎ่ฆ–ๆคœๆŸปใ‚’่กŒใ†ใ€‚

Module Performance Testing
Step7๏ผšใƒขใ‚ธใƒฅใƒผใƒซใฎๆ€ง่ƒฝใƒ†ใ‚นใƒˆ

ใƒขใ‚ธใƒฅใƒผใƒซใฎๆ€ง่ƒฝ่ฉฆ้จ“ใ‚’ๅฎŸๆ–ฝใ—ใ€่ฆๆฑ‚ใ•ใ‚Œใ‚‹ๆŠ€่ก“ไป•ๆง˜ใ‚’ใ™ในใฆๆบ€ใŸใ—ใฆใ„ใ‚‹ใ‹ใฉใ†ใ‹ใ‚’่ฉ•ไพกใ™ใ‚‹ใ€‚

Pre-Assembly Processing
Step8๏ผš็ต„ใฟ็ซ‹ใฆๅ‰ๅŠ ๅทฅ

ใ‚ณใƒใ‚ฏใ‚ฟๅ–ใ‚Šไป˜ใ‘ใƒ—ใƒฌใƒผใƒˆใ€ใƒกใƒณใƒ†ใƒŠใƒณใ‚นใ‚ซใƒใƒผใ‚ทใƒผใƒซใ‚นใƒˆใƒชใƒƒใƒ—ใ€ๅ–ใ‚Šไป˜ใ‘ใƒ–ใƒฉใ‚ฑใƒƒใƒˆใชใฉใฎ้ƒจๅ“ใ‚’ๅ‰ๅ‡ฆ็†ใ™ใ‚‹ใ€‚

Enclosure Cleaning
Step9๏ผšใ‚จใƒณใ‚ฏใƒญใƒผใ‚ธใƒฃใƒผใฎใ‚ฏใƒชใƒผใƒ‹ใƒณใ‚ฐ

ใƒใƒƒใƒ†ใƒชใƒผใฎ็ญไฝ“ใ‚’ๆธ…ๆŽƒใ—ใ€ใปใ“ใ‚Šใ€ใ”ใฟใ€ใใฎไป–ใฎๆฑšๆŸ“็‰ฉ่ณชใ‚’้™คๅŽปใ—ใ€ๅ†…้ƒจใจๅค–้ƒจใฎไธกๆ–นใ‚’ๆธ…ๆฝ”ใซไฟใคใ€‚

Module Installation into Enclosure
Step10๏ผšใƒขใ‚ธใƒฅใƒผใƒซใฎใ‚จใƒณใ‚ฏใƒญใƒผใ‚ธใƒฃใƒผใธใฎๅ–ใ‚Šไป˜ใ‘

ใƒขใ‚ธใƒฅใƒผใƒซใ‚’็ญไฝ“ใซๅ…ฅใ‚Œใ€ใƒฏใ‚คใƒคใƒผใƒใƒผใƒใ‚นใ‚’ๆ•ด็„ถใจไธฆในใพใ™ใ€‚

Step11๏ผšEOL๏ผˆใ‚จใƒณใƒ‰ใ‚ชใƒ–ใƒฉใ‚คใƒณ๏ผ‰ใƒ†ใ‚นใƒˆ

ๅ…จไฝ“็š„ใชใƒ‘ใƒ•ใ‚ฉใƒผใƒžใƒณใ‚นใ‚’ๆคœ่จผใ—ใ€่ฃฝๅ“่ฆๆ ผใซๆบ–ๆ‹ ใ—ใฆใ„ใ‚‹ใ“ใจใ‚’็ขบ่ชใ™ใ‚‹ใŸใ‚ใซใ€ใ‚จใƒณใƒ‰ใƒปใ‚ชใƒ–ใƒปใƒฉใ‚คใƒณใƒปใƒ†ใ‚นใƒˆใ‚’ๅฎŸๆ–ฝใ™ใ‚‹ใ€‚

Top Cover Installation
Step12๏ผšใƒˆใƒƒใƒ—ใ‚ซใƒใƒผใฎๅ–ใ‚Šไป˜ใ‘

ใƒˆใƒƒใƒ—ใ‚ซใƒใƒผใฎไฝ็ฝฎใ‚’ๆฑบใ‚ใฆใ—ใฃใ‹ใ‚Šใจๅ–ใ‚Šไป˜ใ‘ใ€ๆœ€็ต‚็š„ใช็ต„ใฟ็ซ‹ใฆใ‚’ๅฎŒไบ†ใ—ใพใ™ใ€‚

Sealing and Final Inspection
Step13๏ผšใ‚ทใƒผใƒชใƒณใ‚ฐใจๆœ€็ต‚ๆคœๆŸป

ใ‚จใƒณใ‚ฏใƒญใƒผใ‚ธใƒฃใƒผใฎๆฐ—ๅฏ†ๆ€ง่ฉฆ้จ“ใ‚’ๅฎŸๆ–ฝใ—ใ€ใ‚ทใƒผใƒชใƒณใ‚ฐใฎๅฎŒๅ…จๆ€งใ‚’็ขบ่ชใ—ใŸๅพŒใ€ๆœ€็ต‚ใ‚ชใƒ•ใƒฉใ‚คใƒณ่ฃฝๅ“ๆคœๆŸปใ‚’ๅฎŸๆ–ฝใ—ใ€ๆ”พๅ‡บๅŸบๆบ–ใซๅฎŒๅ…จใซ้ฉๅˆใ—ใฆใ„ใ‚‹ใ“ใจใ‚’็ขบ่ชใ™ใ‚‹ใ€‚

่ฉณ็ดฐ

่ฃฝ้€ ใฎ่ฉณ็ดฐใจ่ฃฝ้€ ๅทฅ็จ‹ใซใคใ„ใฆใฏใ“ใกใ‚‰

ใƒ†ใ‚นใƒˆใƒ—ใƒญใ‚ปใ‚น

ใƒ•ใ‚งใ‚ข๏ผ†ใ‚ตใƒผใƒ†ใ‚ฃใƒ•ใ‚ฃใ‚ฑใƒผใ‚ทใƒงใƒณ

่ชๅฎš่ณ‡ๆ ผใฏherewinใฎๆœ€ๅคงใฎๅผทใฟใ ใ€‚
ใ‚ใ‚‰ใ‚†ใ‚‹ๅธ‚ๅ ดใฎใƒ‹ใƒผใ‚บใซๅฏพๅฟœใ—ใ€ไพ›็ตฆๅ…ƒๅทฅๅ ดใฏๅ“่ณชใ‚’ไฟ่จผใ™ใ‚‹ใŸใ‚ใซๅฎŒๅ…จใซ่ช่จผใ•ใ‚Œใฆใ„ใ‚‹ใ€‚

Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title
Default Title

้€ฃ็ตกๅ…ˆ

ใ‚ใชใŸใฎๅธ‚ๅ ดใŒๅฟ…่ฆใจใ™ใ‚‹ใ‚ฏใƒฌใƒ‡ใƒณใ‚ทใƒฃใƒซใ‚’็Ÿฅใ‚ŠใŸใ„ใงใ™ใ‹๏ผŸ้ซ˜่งฃๅƒๅบฆใฎ็”ปๅƒใ‚’ใŠ้€ใ‚Šใ—ใพใ™ใ€‚

้–ข้€ฃใ‚ซใƒ†ใ‚ดใƒชใƒผ

Drone-Battery-
Battery-Cells-1
Home-Energy-Storage-Solutions-2
Semi-Solid State Drone Battery
Industrial-EV-Battery-Packs

ใ‚ˆใใ‚ใ‚‹ใ”่ณชๅ•

What is the typical return-on-investment (ROI) period for a C&I energy storage battery?

It depends on your electricity consumption and the local peak-valley price gap. In most cases, the system recoups its cost through peak-valley arbitrage and reduced outage losses. For example, in regions like the Pearl River Delta with 10kV dual-rate tariffs, a “two charges, two discharges per day” strategy can achieve full payback within 3 years, followed by 5โ€“9 years of pure electricity cost savings.

้–ข้€ฃใƒ–ใƒญใ‚ฐ

Scalable drone delivery network across distribution hubs, fulfillment centers and delivery zones
Zipline, Wing, and Walmart show drone delivery scales through networks, platforms, and retail integration โ€” not aircraft alone. Here’s what it takes.
High-voltage lithium polymer (LiHV) drone battery pack for UAV system design
Raising a LiPo cell’s full-charge voltage adds energy, but it costs more in charging, power electronics, aging and validation. Find out when LiHV is worth it.
Several types of heavy-lift cargo and industrial drones operating in an aerial logistics landscape, representing the parallel commercial UAV markets emerging in 2026
Heavy-lift drone manufacturers in 2026 span commercial delivery, industrial lifting, autonomous cargo, agriculture and sensing. Here are 10 to know and how to evaluate them.
Technical lithium battery cell and cycle-life test report in a lab setting
A supplier says a cell lasts 1,000, 2,000 or 5,000 cycles. Learn how to read and verify a lithium battery cycle-life test report before you trust the number.
Multiple long-endurance commercial drone architectures operating in a single industrial landscape: a hybrid VTOL fixed wing in cruise, a gas-electric hybrid multirotor over a survey site, a battery-electric mapping tailsitter and a large autonomous hybrid cargo VTOL, conveying mission productivity and continuous aerial operations in 2026
Long-endurance commercial drones in 2026 span battery VTOL, hybrid, survey and autonomous cargo. 10 to know, judged by mission productivity, not flight time.
Industrial heavy-lift cargo drone with a high-energy-density lithium battery pack integrated into the airframe
Which 500Wh/kg lithium-metal UAV batteries are usable today, which are still lab-stage, and the four questions to ask every supplier before you commit.

ๆ–ฐใ‚ซใ‚ฟใƒญใ‚ฐ

ๅ•†ๆฅญใƒป็”ฃๆฅญ็”จใ‚จใƒใƒซใ‚ฎใƒผ่ฒฏ่”ตใ‚ฝใƒชใƒฅใƒผใ‚ทใƒงใƒณใฎ่ฉณ็ดฐใจๅ…จ่ฃฝๅ“ใ‚’ใ”่ฆงใใ ใ•ใ„ใ€‚

jaๆ—ฅๆœฌ่ชž
ใƒˆใƒƒใƒ—ใซๆˆปใ‚‹

ไปŠใ™ใ็„กๆ–™ใŠ่ฆ‹็ฉใ‚‚ใ‚Šใ‚’ ๏ผ

ใŠๅ•ใ„ๅˆใ‚ใ›ใƒ•ใ‚ฉใƒผใƒ ใƒ‡ใƒข (#3)
ใ”ไธๆ˜Žใช็‚นใŒใ”ใ–ใ„ใพใ—ใŸใ‚‰ใ€ใŠๆฐ—่ปฝใซใŠๅ•ใ„ๅˆใ‚ใ›ใใ ใ•ใ„ใ€‚